With the old wooden beam gone, the belfry looks quite different!
All ringing has stopped until the job is complete.
The task yesterday was to rig up a pulley to take the heaviest items of lifting gear up the tower. These include a 8' steel girder (to replace the wooden one in the photo) and a heavy 1000kg chain block. We also have the use of 2 x 500kg blocks, a 30cwt pull lift and a handful of strops, all of which were tested and certified last week.
All the ropes have been identified and untied prior to the removal of the wheels and headstocks.