Tuesday 18 December 2018

Rope guide finished

The ringing room is pretty much finished now, apart from painting the modified rope guide.

It produces quite a good circle and where possible, makes use of existing holes and gaps between the beams. It looks anticlockwise from below!

Above this, we are now pretty much ready for the return of headstocks.


This is the 7th bell sitting where we left it a while ago sitting on a temporary steel grillage. The other bells are sitting on the bell frame.