Friday 8 December 2017

In the workshop

The three Rudhall bells are now being worked on in Matthew Higby's workshop.

The first stage after removing the headstocks is to remove the old wooden pads and to cast an epoxy resin pad on top of the bell.

This is the 5th bell with the pad newly cast.

This pad is then machined to provide a flat surface for when the bell is put on the vertical boring machine for tuning.

No comments:

Post a Comment