Tuesday 10 September 2019

Swinging tenor

The tenor is now sitting on its bearing, next to the treble.


The bed plates were collected over the weekend, so bell by bell they can now be fitted. The tenor was fitted tonight, and the bed plates fixed to the frame with coach screws. The bottom half of the wheel was put in place to check the alignment with the pulley.

All that needs doing now is to fit the stay and slider and to move the pulley up 85mm. The refurbished bearings mean that the bell is 85mm higher up!

No comments:

Post a Comment